4.
DONE
00
The joint is complete when
the jaws have been
completely closed over the
copper sleeve and it has
been checked with the
gauging tool supplied.
3.
CRIMP IT
00
Place the jaws of the
crimping tool over the
copper sleeve making sure
they are square and right
alongside the insulating
ring. Close the handles
slowly taking care to keep
the jaws square with the
fitting.