Background Image
Previous Page  33 / 44 Next Page
Basic version Information
Show Menu
Previous Page 33 / 44 Next Page
Page Background

4.

DONE

00

The joint is complete when

the jaws have been

completely closed over the

copper sleeve and it has

been checked with the

gauging tool supplied.

3.

CRIMP IT

00

Place the jaws of the

crimping tool over the

copper sleeve making sure

they are square and right

alongside the insulating

ring. Close the handles

slowly taking care to keep

the jaws square with the

fitting.